City of LA Drawing"As consultants, designers and manufacturers of high-voltage equipment solutions we concentrate all of our efforts on our core business."

Customer:

Department of Water and Power, City of Los Angeles

Location:

Los Angeles CA, USA

Industry:

Utility

Challenge:

To design a tailor-made solution that:

  • considerably minimizes space requirements
  • inter-connects four vacuum switches
  • provides common grounding point
  • ensures ease of installation and maintenance
  • maintains highest safety standards

 

Solution:

Unique compact design with multiple connection points for flexible interconnection as well as common grounding point increasing worker safety.

 

Product:

Stacked-Style Junction Bar

 

Key applications:

  • with four vacuum switches four 600 Amp bushings provide individual circuit isolation
  • central 200 Amp universal well offers grounding point

 

Benefits:

The Junction Bar solutions of Patton & Cooke Co. offer a variety of benefits to the customer:

  • resistance to extreme temperatures, acids, alkalis, solvents and stress fracturing
  • no amalgamation with rubber inserts and elbows
  • rigid composition preventing deformation under cable loading
  • excellent fault current withstand
  • internal ground shield interconnected with mounting inserts
  • internal ground screen and topical conductive material provide full module grounding
  • damaged 200 Amp universal well stud easily removed with 5/32” A/F hexdriver
  • reduced downtime
  • easy stud removal regardless of size or condition

 

PresentationPresentation
JBY Presentation
Right click on link, Select "Save Target As"

 
PresentationMultimedia
Indestructible J Bars
 
PresentationCase Studies
Toronto Hydro
Allegheny Power
LA Dept of Power and Water
City of Los Angeles